

1/4

Set Build | Design Development | Commercial
2021
Rule One completed the end-to-end design and installation of the Budweiser Brewing Group (AB InBev) suite at Arsenal's Emirates Stadium.
Taking a premium hospitality space from drawing board to a live stadium took precision, technical problem-solving and close attention to detail. The aim was to keep the edgy, industrial feel of the original 3D render and turn it into a space that works hard for fans on matchday.
Client: Budweiser Brewing Group (AB InBev) · Location: Emirates Stadium, London · Scope: Design, fabrication, installation
More set build · Send us your brief
Rule One completed the end-to-end design and installation of the Budweiser Brewing Group (AB InBev) suite at Arsenal's Emirates Stadium.
Taking a premium hospitality space from drawing board to a live stadium took precision, technical problem-solving and close attention to detail. The aim was to keep the edgy, industrial feel of the original 3D render and turn it into a space that works hard for fans on matchday.
Client: Budweiser Brewing Group (AB InBev) · Location: Emirates Stadium, London · Scope: Design, fabrication, installation
More set build · Send us your brief